Images

Quaid e Azam Solar Power Project

Pakistan First Largest Solar Power Project of 1000MW

Pakistan’s Leading Minister Nawaz Sharif inaugurated Pakistan’s first a solar panel park, which will start off making 100 megawatts of energy because of the stop on the yr plus a entire of just 1000 megawatts till 2016. The actual Quaid-e-Azam Sun Park undertaking has four hundred, 400,000 solar panels, with a entire charge regarding around $131 million. Any time finish the particular place will certainly create with regards to a couple of. 5 situations the facility coming from the 392 megawatt Ivanpah sun arctic place in California’s Mojave Wilderness, so that it is one of many largest sun areas on this planet.

“If an individual are available in this article immediately after 1 . 5 years, you will notice any pond regarding solar panels, home houses as well as practices — it will likely be a brand new entire world, ” explained web page industrial engineer Muhammad Sajid, directing towards the encircling leave.
 On the occasion shortly after the inauguration, Sharif approved expanding the project from from 10,000 acres to 15,000 acres and increasing the capacity from 1,000 megawatts to 1,500 megawatts.
Images

MP-5 Sub Machine Gun

Pakistan Export Machine Gun to US

Pakistan Weapon manufacturing company exported MP-5
 sub-machine gun to United States.
Images

Foreign Exchange Reserves

Foreign Exchange Reserves cross 15 Billion Dollar in July-14.

Told National Assembly

ISLAMABAD:
 Finance Minister Ishaq Dar told the National Assembly on Thursday that Pakistan’s foreign exchange reserves will cross $15 billion in July, while GDP growth rate is expected to touch 4 per cent during the current fiscal year.
Commenting about the latest economic indicators, Dar said that the GDP growth rate currently stands at 3.4 per cent while reserves are at $13 bn.
The finance minister said that inflation rate is at 8.6 per cent, which has been brought down to single-digit during the Pakistan Muslim League government.
“The international community and financial institutions are also recognizing that the country’s growth is witnessing an upward trend while inflation is on the decline as yet,” he said.
He said that tax collection had also recorded a growth of 15.6 per cent during the current year.
“The returns of Federal Board of Revenue (FBR) have witnessed a growth of 15.6 percent during the first ten months of the current financial year while the FBR has collected Rs1,745 billion as compared to Rs1,509 billion rupees collected during the same period last year,” he added.
The minister said that exports have risen to $19 billion – showing a growth of 6 per cent – while imports remained at $33 billion during the last nine months.
Dar claimed that remittances also witnessed a growth of 11.4 per cent, with $1,289 billion received so far under the head of remittances as against $1,157 billion received during the same period last year.

Images

Euro Bonds Profit ($2 billion)

Pakistan boosts $2b through Euro bonds


ISLAMABAD:
Inside largest-ever sole exchange, Pakistan continues to be in a position to boost $2 billion from overseas personal debt promotes throughout the issuance regarding five- and also 10-year dollar-denominated Dollar provides, getting a massive action toward assembly an international Monitory Fund (IMF) ailment regarding improving the yucky established supplies to $9 billion.
“Pakistan’s connect ended up being extremely over-subscribed and also obtained $5. only two billion presents although many of us decided to recognize $2 billion, ” Rana Assad Amin, this Ministry regarding Money.
It had been the best sum of which Pakistan provides at any time lifted within a test and also indicates this improving self-assurance regarding overseas people about insurance policies in the PML-N authorities, based on experts.
Images

Oranges Export

Pakistan exports 1209. 1mn great deal of Oranges within few months.



ISLAMABAD: 
Pakistan has exported 1209. 1 trillion heap regarding oranges in the course of first half a year regarding latest economical season which added numerous dollar to countrywide your pet.
Pakistan has a lot more than 300 finalizing plants in output regions of oranges to help keep this taste, smell and also enrich rack lifetime regarding citrus fruit in which grapefruits will also be prepared.


Ministry involving Marketing sources in Thursday claimed simply no land has got into contact with regarding move involving a melon over the season 2013-14, since usually the particular importers approach straight to the particular exporters regarding importance involving a melon.
These people claimed Pakistan Horticulture Advancement & Upload Company (PHDEC), established with requirement to function regarding manufacturing, improvement and move involving garden products has performed trainings/workshops/seminars regarding capacity making involving growers, processors and exporters.
Images

DASU DAM

DASU DAM Construction GO ahead for completion








 
Country : Pakistan
Project : Dasu Hydropower Project
Client : Water and Power Development Authority
Project Period : 2011 - Present
Project Overview : Only a small portion of hydropower potential (about 15%) has been developed in Pakistan. Dasu Hydropower Project is one of the series of hydropower development projects included in Vision 2025 Program developed by WAPDA in 2001. Installed capacity (4,320 MW) will cover 90% of actual electricity shortage, which is imposing six hour planned blackouts even on the metropoplitan area.
Features : - Installed Capacity: 4,320 MW
- Annual Energy (Pre-Basha): 18,432 GWh
- Gross Head: 187.17 m, Design Head 179.51 m
- Dam Type: Gravity dam (RCC construction)
- Dam Height & Crest Length: H=242 m, L=570 m
- Gross Reservoir Storage: 14,100 million m3
- Specifications of Power Tunnel: 4 nos. D=12.0 m, L=450 m (concrete lined)
- Penstock: three-manifold type, D=5.5 m, L=107 m (steel lined)
- Diversion Tunnels: 2 units, L=1,261/1,101 m
Our Services : DD, CS

Images

BOSTON DAM BALOCHISTAN

PROSPECTS of BOSTON DAM



Name                                =              BOSTON delay action DAM

Location                            =              District Pishin, Balochistan

Approved Cost                 =               121.849 million

Date of completion            =               September 2012

BALOCHISTAN:

Bostan Wait Actions Dam, Center Pishin. Development started out last year, concluded with 2012. 500 acres connected with terrain added underneath cultivation on account of that dam, which is area of the Balochistan 100 Dams Project from the Federal/Provincial Governing bodies.